On the second day at the Farm, slave had to dig a long trench between two of the buildings for layin
On the second day at the Farm, slave had to dig a long trench between two of the buildings for laying down a power line SIRS. The trench only had to be 14 inches deep, but it was long (120 yards maybe) and took the whole day to dig, lay the wire and refill SIRS. While the day started sunny, thunder showers came in the evening, SIRS. That of course did not stop the work SIRS. -- source link
Tumblr Blog : slaveforlabor.tumblr.com